“Hydraulic Analysis of the Cisangkuy River Weir Development Plan to Increase Flow at the PDAM (Regional Water Company) Inlet”. 2026. Journal of Engineering 32 (6): 1-21. https://doi.org/10.31026/j.eng.2026.06.01.