“Hydraulic Analysis of the Cisangkuy River Weir Development Plan to Increase Flow at the PDAM (Regional Water Company) Inlet” (2026) Journal of Engineering, 32(6), pp. 1–21. doi:10.31026/j.eng.2026.06.01.